{"id":4398,"date":"2016-01-05T15:27:37","date_gmt":"2016-01-05T15:27:37","guid":{"rendered":"http:\/\/www.minerasancristobal.com\/v3\/en\/?page_id=4398"},"modified":"2020-01-21T16:45:20","modified_gmt":"2020-01-21T16:45:20","slug":"investment","status":"publish","type":"page","link":"https:\/\/www.minerasancristobal.com\/v3\/en\/inicio\/our-company\/investment\/","title":{"rendered":"Investment"},"content":{"rendered":"<section class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text]The most important mining project of Bolivia with an approximate investment of <strong>1.8 billion dollars<\/strong>. These funds have been used in exploration works, a feasibility study, environmental studies, project engineering, preparation of the mine, construction of the plant and the supporting infrastructure, working capital, sustaining capital and financial expenses.<\/p>\n<p>With regard to infrastructure, today more than <strong>200 kilometers<\/strong> of roads and bridges and a railway branch of <strong>65 kilometers<\/strong> ensure better connections of the communities to the region, the Department of Potos\u00ed and the country.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;]<div class=\"grve-element grve-counter grve-align-center\" style=\"\">  <div class=\"grve-icon fa fa-dollar grve-color-primary-1\"><\/div>  <div class=\"grve-counter-content\">    <div class=\"grve-counter-item grve-color-primary-1\">      <span data-thousands-separator-vis=\"\" data-thousands-separator=\",\" data-prefix=\"\" data-suffix=\"M\" data-start-val=\"1000\" data-end-val=\"1800\" data-decimal-points=\"0\" data-decimal-separator=\".\">1000<\/span>    <\/div><h5 class=\"grve-counter-title\"><span>Appr. Investment<\/span><\/h5>  <\/div><\/div>[\/vc_column][vc_column width=&#8221;1\/4&#8243;]<div class=\"grve-element grve-counter grve-align-center\" style=\"\">  <div class=\"grve-icon fa fa-ellipsis-h grve-color-primary-1\"><\/div>  <div class=\"grve-counter-content\">    <div class=\"grve-counter-item grve-color-primary-1\">      <span data-thousands-separator-vis=\"\" data-thousands-separator=\",\" data-prefix=\"\" data-suffix=\"Km\" data-start-val=\"100\" data-end-val=\"200\" data-decimal-points=\"0\" data-decimal-separator=\".\">100<\/span>    <\/div><h5 class=\"grve-counter-title\"><span>Roads and Bridges<\/span><\/h5>  <\/div><\/div>[\/vc_column][vc_column width=&#8221;1\/4&#8243;]<div class=\"grve-element grve-counter grve-align-center\" style=\"\">  <div class=\"grve-icon fa fa-subway grve-color-primary-1\"><\/div>  <div class=\"grve-counter-content\">    <div class=\"grve-counter-item grve-color-primary-1\">      <span data-thousands-separator-vis=\"\" data-thousands-separator=\",\" data-prefix=\"\" data-suffix=\"Km\" data-start-val=\"20\" data-end-val=\"65\" data-decimal-points=\"0\" data-decimal-separator=\".\">20<\/span>    <\/div><h5 class=\"grve-counter-title\"><span>Railway Branch<\/span><\/h5>  <\/div><\/div>[\/vc_column][vc_column width=&#8221;1\/4&#8243;]<div class=\"grve-element grve-counter grve-align-center\" style=\"\">  <div class=\"grve-icon fa fa-lightbulb-o grve-color-primary-1\"><\/div>  <div class=\"grve-counter-content\">    <div class=\"grve-counter-item grve-color-primary-1\">      <span data-thousands-separator-vis=\"\" data-thousands-separator=\",\" data-prefix=\"\" data-suffix=\"Km\" data-start-val=\"140\" data-end-val=\"172\" data-decimal-points=\"0\" data-decimal-separator=\".\">140<\/span>    <\/div><h5 class=\"grve-counter-title\"><span>Power Lines<\/span><\/h5>  <\/div><\/div>[\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]In terms of basic services, <strong>MSC<\/strong> completed a power transmission line of <strong>172 kilometers<\/strong> long, supported the preparation of designs and studies for a water harvesting and treatment system, and put in place potable water connections in the communities for the benefit of hundreds of local families.<\/p>\n<p>In 2013 <strong>MSC<\/strong> bought state-of-the-art machinery comprising ten 793D Caterpillar trucks, two KOMATSU PC8000 hydraulic shovels and two Atlas Copco Pit Vipper 351 drills.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"grve-element grve-gallery grve-isotope grve-gallery-popup\" style=\"\" data-gutter=\"yes\" data-type=\"3-columns\" data-layout=\"fitRows\"><div class=\"grve-isotope-container\"><div class=\"grve-isotope-item \"><a href=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/tren-transportando-contenedores-2.jpg\"><figure class=\"grve-image-hover grve-zoom-in\"><div class=\"grve-media grve-primary-1-overlay grve-opacity-40\"><img loading=\"lazy\" decoding=\"async\" width=\"560\" height=\"560\" src=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/tren-transportando-contenedores-2-560x560.jpg\" class=\"attachment-grve-image-small-square size-grve-image-small-square\" alt=\"\" srcset=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/tren-transportando-contenedores-2-560x560.jpg 560w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/tren-transportando-contenedores-2-150x150.jpg 150w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/tren-transportando-contenedores-2-120x120.jpg 120w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/tren-transportando-contenedores-2-80x80.jpg 80w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/><\/div><figcaption><\/figcaption><\/figure><\/a><\/div><div class=\"grve-isotope-item \"><a href=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/rse2.jpg\"><figure class=\"grve-image-hover grve-zoom-in\"><div class=\"grve-media grve-primary-1-overlay grve-opacity-40\"><img loading=\"lazy\" decoding=\"async\" width=\"560\" height=\"560\" src=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/rse2-560x560.jpg\" class=\"attachment-grve-image-small-square size-grve-image-small-square\" alt=\"\" srcset=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/rse2-560x560.jpg 560w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/rse2-150x150.jpg 150w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/rse2-120x120.jpg 120w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/rse2-80x80.jpg 80w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/><\/div><figcaption><\/figcaption><\/figure><\/a><\/div><div class=\"grve-isotope-item \"><a href=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/construccion-del-domo-28.jpg\"><figure class=\"grve-image-hover grve-zoom-in\"><div class=\"grve-media grve-primary-1-overlay grve-opacity-40\"><img loading=\"lazy\" decoding=\"async\" width=\"560\" height=\"560\" src=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/construccion-del-domo-28-560x560.jpg\" class=\"attachment-grve-image-small-square size-grve-image-small-square\" alt=\"\" srcset=\"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/construccion-del-domo-28-560x560.jpg 560w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/construccion-del-domo-28-150x150.jpg 150w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/construccion-del-domo-28-120x120.jpg 120w, https:\/\/www.minerasancristobal.com\/v3\/en\/wp-content\/uploads\/2016\/01\/construccion-del-domo-28-80x80.jpg 80w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/><\/div><figcaption><\/figcaption><\/figure><\/a><\/div><\/div><\/div>[\/vc_column][\/vc_row]<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text]The most important mining project of Bolivia with an approximate investment of 1.8 billion dollars. These funds have been used in exploration works, a feasibility study, environmental studies, project engineering, preparation of the mine, construction of the plant and the supporting infrastructure, working capital, sustaining capital and financial expenses. With regard to infrastructure, today more [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":4331,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4398","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/pages\/4398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/comments?post=4398"}],"version-history":[{"count":15,"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/pages\/4398\/revisions"}],"predecessor-version":[{"id":5200,"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/pages\/4398\/revisions\/5200"}],"up":[{"embeddable":true,"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/pages\/4331"}],"wp:attachment":[{"href":"https:\/\/www.minerasancristobal.com\/v3\/en\/wp-json\/wp\/v2\/media?parent=4398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}